LOCATION

Union Township, Snyder County, PA

CLIENT

Union-Chapman Regional Authority

DESCRIPTION

Check-out,start-up and operations of Authority's new wastewater treatment plant.

SCOPE OF WORK

Operations and maintenance of wastewater treatment plant

Union Township Wastewater Facilities

ARRO began operating the Union-Chapman Regional Authority's facility in October 2005.

The facility, a 0.1 MGD Austen Biojet sequencing batch reactor treatment plant and collection system, has two pumping stations and 50 residential grinder pumping stations. There are 300 homes and a camper/recreational vehicle manufacturing plant connected to the Authority's system which has approximately 350 equivalent dwelling units.

ARRO's operators are responsible for normal operation and maintenance of the facilities, including staffing, operator licensing, biological process control, mechanical equipment operation, sampling, laboratory analyses, routine equipment maintenance, record keeping, general housekeeping to equipment, and other miscellaneous tasks.

Welcome

Quisque diam lorem interdum vitaapibu ac scue vitae ec eget tellus non eratinia fermentuonec in velit vel ipsum aucvina ullamcorper urna et feliestibulum iaculis lacinia est.

Proin dictum elementum velit. Fusuod consequat ante. Lorem ipsum do sitet consectetuer adipiscing elit. Pelle sque sed dolor. Aliquam congue fermentum nisl. Mauris accumsa.

EMBEDDED MINI APP
News App (Kreider Style)
ARRO Consulting, Inc.
(717) 569-7021    108 W. Airport Road    Lititz, PA 17543