DESCRIPTION
ARRO executed a three-phase plan that started from the ground up and included stormwater and wastewater solutions, as well as environmental considerations in this floodplain.
SCOPE OF WORK
Planning and design of a 24-acre municipal park
Doubs Meadow Park
To efficiently proceed and to meet stormwater regulations, ARRO developed hydrologic and hydraulic models of the 34-square mile watershed and utilized an HEC-1 computer program to calibrate peak flows for various storm events.
ARRO also utilized HEC-RAS to develop existing and proposed 100-year floodplains and a 100-year floodway for the proposed 24-acre park at the confluence of Little Catoctin and Middle creeks.
The improvements for Phase I consisted of:
- A new entrance to the park
- State Route 17 grading, storm drainage, paving and pavement markings for widening
- Grading, storm drainage and gravel for 100 parking spaces
- Mass grading of ball fields
- Sediment and erosion control
- Seeding and mulching disturbed areas
The improvements for Phase II consisted of:
- Paving the basketball court, walk/bike path
- Installing 40 linear feet of CMPA culvert
- Installing four baseball field bleacher pads
- Hot mix asphalt parking lot paving
- Signage, markings and related work
The improvements for Phase III consisted of constructing a new pavilion, furnishing and installing site lighting, minor grading, seeding and mulching of disturbed areas, and related work.
Welcome
Quisque diam lorem interdum vitaapibu ac scue vitae ec eget tellus non eratinia fermentuonec in velit vel ipsum aucvina ullamcorper urna et feliestibulum iaculis lacinia est.
Proin dictum elementum velit. Fusuod consequat ante. Lorem ipsum do sitet consectetuer adipiscing elit. Pelle sque sed dolor. Aliquam congue fermentum nisl. Mauris accumsa.
News App (Kreider Style)